Welcome to FlowMetrics

Follow the steps in this guide to connect your board,
explore your metrics, and start making smarter
decisions based on real flow data.

Log In

After you added FlowMetrics to your subscriptions, use FlowMetrics button at the navigation bar:
FM_login

Get Started

Once logged in:

1. Go to Settings to configure your preferences and account options.
FM_settings
2. Chose Manage Data Sources and click Connect a New Data source to link FlowMetrics to your existing workflow system.
FM_data_source
FM_Connect_data_source
3. The FlowMetrics Wizard will open. Start by selecting your data provider – Jira Cloud, Jira Server, Azure Boards, or Businessmap (Kanbanize). Then follow Wizard instructions.
FM_ds

Analytics

Once the setup is complete, you 'll have access to a full suite of analytics dashboards. Here's a glimpse of what FlowMetrics looks like in action:
6_3ffb699f-c672-46e7-9f3d-d6ca016de9c1
Click on any metric to open a detailed drill - down view. For example, the Lead Time Drill Down shows the historical trend of lead times broken down by Portfolio, Team, and Individual Contributor - with separate lines for Development and Disco very work types. Use the tabs at the top to switch between Historical View, Predictability, Histogram, Scatterplot, Work Type Overview, and Completed Work Detailed Report.
The Fitness Criteria section gives you an instant health check of your delivery process. The top row displays key metrics: Lead Time, Lead Time Target Met, Delivery Predictability, Delivery Rate Comparison, Value Delivered, and Workflow Efficiency.

Work Overview section breaks work down into Upcoming Work, Work in Progress, and Completed Work - each with a historical view
and v olume counts.
7_5224def2-31db-41cc-af43-800ac8584fc4
8_c38eef2f-5725-4cbe-b23c-dc190259cb70
In the Loupe view, clicking on any portfolio item opens a detailed card for that initiative. It includes two status donut charts showing progress distribution (On Track / At Risk / Behind / Not Rated), a completion progress bar across all linked boards, and four summary sections: Scope (total items broken down by Not Started, In Progress, and Completed), Predictive Analysis (forecasted delivery date with estimated confidence level), Risk (risk exposure in days and financial impact), Dependency (dependencies categorised by severity - High, Medium, Low), and a Burndown chart tracking remaining work against the target timeline.

If you have any questions or need assistance getting started

We're happy to help!